Сall now: +7 (351) 200-33-79, Viber/WhatsApp: +7 902 022-88-48 | Mo – Fr: 700 – 1700 MSK
  • Russia, Chelyabinsk city
  • Samohina street, 188
Machine-building holding — drilling machines and
installations, drilling tools, crawler bases,
wood-cutting complexes, special equipment
  • Russia, Chelyabinsk city
  • Samohina street, 188

Catalog

Tools for Rod Pusher

Description

The puncture method consists in radial compaction of the soil when pressing a pipe with a conical tip.
The sequence of works:
- - open the acceptance panels and install the jack
- lay the first link of the pipe with a conical nozzle
- verify the horizontal position of the pipe
- push the link into the length of the rod
- after the first link, weld the second and repeat the operation

This method is used to lay pipes up to 500 mm in well-compressible soils.
In sandy soils, it is necessary to apply vibration for the first link and the diameter of the pipes is not more than 300 mm.

Specifications

 1 Штанга буровая     shtanga.png
 2 Пика буровая  pika.png
 2.1 Буровой пилот  pilot.png
     
3 Стартовая штанга   4.png
 4 Расширитель  rasshiritel.png
 5 Вертлюг  vertlug.png
 6 Трубозахват  trubozahvat.png

Description

The puncture method consists in radial compaction of the soil when pressing a pipe with a conical tip.
The sequence of works:
- - open the acceptance panels and install the jack
- lay the first link of the pipe with a conical nozzle
- verify the horizontal position of the pipe
- push the link into the length of the rod
- after the first link, weld the second and repeat the operation

This method is used to lay pipes up to 500 mm in well-compressible soils.
In sandy soils, it is necessary to apply vibration for the first link and the diameter of the pipes is not more than 300 mm.

Specifications

 1 Штанга буровая     shtanga.png
 2 Пика буровая  pika.png
 2.1 Буровой пилот  pilot.png
     
3 Стартовая штанга   4.png
 4 Расширитель  rasshiritel.png
 5 Вертлюг  vertlug.png
 6 Трубозахват  trubozahvat.png